Null

English | Spanish | Dutch
Log in

China Tunnel Technology: Study on Tunnelling Performance of Dual-Mode Shield TBM by Cutterhead Working Performance and Tunnelling Difference Comparison: A Case in Shenzhen Metro Line 12

    Chu Yang
    By Chu Yang Replies (1)


    Fan Wu, Qiuming Gong

    Key Laboratory of Urban Security and Disaster Engineering of Ministry of Education, Beijing University of Technology, Beijing, 100124, China

    Zhigang Li

    Sinohydro Bureau 1 Co., Ltd., Changchun, 130033, China

    Liu Huang

    Key Laboratory of Urban Security and Disaster Engineering of Ministry of Education, Beijing University of Technology, Beijing, 100124, China

    Qianwei Sun & Qiuyu Liu

    Sinohydro Bureau 1 Co., Ltd., Changchun, 130033, China

    https://link.springer.com/article/10.1007/s00603-023-03328-w

    image

    image