By S. Autuori, M.V. Nicotera, G. Russo, A. Di Luccio, G. Molisso
A chapter from the book
Tunnels and Underground Cities: Engineering and Innovation Meet Archaeology, Architecture and Art
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
https://www.taylorfrancis.com/chapters/edit/10.1201/9781003031857-8/effects-construction-demolition-tbm-excavated-tunnel-inside-existing-diaphragm-walls-autuori-nicotera-russo-di-luccio-molisso
Effects of construction and demolition of a TBM excavated tunnel insid
www.taylorfrancis.comThe Line 6 of Naples Underground is part of the underground network system. The paper reports aspects of the design and monitoring data during the tunnel