TBM Cutterhead Load Prediction Model Based on the Two-Stage Attention Mechanism
Mengqi Zhu, Dansheng Yao, Hehua Zhu, Bingyi Pan, Yudan Gou, Nan Jiang
Published at Information Technology in Geo-Engineering
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
https://www.springerprofessional.de/tbm-cutterhead-load-prediction-model-based-on-the-two-stage-atte/50173152
TBM Cutterhead Load Prediction Model Based on the Two-Stage Attention Mechanism
www.springerprofessional.deThe key to improving the geological adaptability of TBM is to understand the interaction between the rockmass and the TBM operational data. Since the