240321 TBM Cecilia breakthrough at Chiltern Tunnel North Portal
released by High Speed 2 https://mediacentre.hs2.org.uk/resources/240321-tbm-cecilia-breakthrough-at-chiltern-tunnel-north-portal-dji-0064
HS2 Chiltern Tunnel TBM Cecilia Breakthrough
released by High Speed 2 Project at https://mediacentre.hs2.org.uk/resources/240321-hs2-chiltern-tunnel-tbm-cecilia-breakthrough-655
High Speed 2 project, the HS2 TBM 'Florence' breakthrough after boring 16km long Chiltern tunnel. Florence is one of the 10 giant Herrenknecht Tunnel Boring Machines that are used. Photo has date 27 February 2024
London, United...
High Speed 2 project, the HS2 TBM 'Florence' breakthrough after boring 16km long Chiltern tunnel. Florence is one of the 10 giant Herrenknecht Tunnel Boring Machines that are used. Photo has date 27 February 2024
London, United...
HS2 TBM Florence within the Chiltern tunnel
from HS2 media https://mediacentre.hs2.org.uk/news/tunnel-progress-as-hs2s-florence-and-cecilia-reach-chesham-road- scaled
Father Timothy Gorham performs the blessing of HS2 TBMs and St Barbara statues on patron saint day
source: https://mediacentre.hs2.org.uk/resources/father-timothy-l-estrange-blesses-hs2-tbms-and-st-barbara-statues-on-patron-saint-day-2