Mumbai-Ahmedabad Bullet Train On Right Track: Ghansoli Tunnel Excavation Complete
Indian company Afcons Infrastructure has successfully excavated a 394-meter-long Additionally Driven Intermediate Tunnel (ADIT) at Ghansoli using the NATM method. https://www.news18.com/india/mumbai-ahmedabad-bullet-train-on-right-track-ghansoli-tunnel-excavation-complete-8905443.htmlReply on topic: Mumbai-Ahmedabad Bullet Train On Right Track: Ghansoli Tunnel Excavation Complete
https://www.news18.com/india/mumbai-ahmedabad-bullet-train-on-right-track-ghansoli-tunnel-excavation-complete-8905443.htmlReply on topic: Mumbai-Ahmedabad Bullet Train On Right Track: Ghansoli Tunnel Excavation Complete
https://www.republicworld.com/india/mumbai-ahmedabad-bullet-train-afcons-infrastructure-completes-tunneling-work-for-key-segment/Chennai Metro Phase II: 20 Km Completed, 96 Km To Go, Delays Persist
This includes a 10.77 km tunnel and a 10 km elevated section, linking at least 25 localities across the city and suburbs. https://swarajyamag.com/infrastructure/chennai-metro-phase-ii-20-km-completed-96-km-to-go-delays-persist CMRLBART to downtown San Jose will cost $12.8B. How did we get here?
'The project has been subject to a lot of criticism. It’s been repeatedly bashed for a redundant Santa Clara station, choice of a single-bore design for the tunn...
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com