English | Spanish | Dutch
Log in

Results for "Gülermak"

Tags

    • Keith Keloe

      INDIA - Banglore Metro Phase II goes ahead

      The first 2 of four contracts for building the 14km-long tunnel for the Bangalore Metro Phase 2 have been awarded to Indian company Larsen & Toubro: https://bit.ly/364pjYp

      Tags: tunnel tender, tunnel tenders, india tunnel, tenders, Larsen & Toubro, Afcons, Gülermak, ITD, HCC, Banglore Metro

      • Teodor Adamczyk

        Świna tunnel TBM pictures at CREG Factory China

        Świna tunnel TBM is in advanced state of manufacture. Chinese company CREG (China Railway Engineering Group) continues assembly started last year. Electric motors, main propellers and reducers, as well as the main bearing, hydraulic pump and front and middle discs for 13.5 meter diameter tunn...

        • Teodor Adamczyk

          Świna tunnel construction progress so far

          A good video summarizing the Świna tunnel construction so far in a nut shell. https://www.youtube.com/watch?v=3JQ8ghVIABs

          • Teodor Adamczyk

            Świna tunnel (Tunel Świnoujście) excavation reaches half point

              Contractor GULERMAK already bored 742 meters of the tunnel in Świnoujście. It is half the length of the bored tunnel. The CREG TBM "Wyspiarka" has laid 417 rings approaching the shore of the Świna Strait from the side of the Wolin Island. The tunnel excavation should be comple...

            • Teodor Adamczyk

              The underwater Świną tunnel crosses the symbolic 1000 metres of boring

              https://www.youtube.com/watch?v=rcuwenFpE58 The boring of the tunnel under the Świna is going all fine according to plans. This declares Andrzej Adamczyk, Minister of Infrastructure on Polish Radio. According to Wprost, Poland's General Directorate for National Roads and Motorways (G...

              • Teodor Adamczyk

                Poland: Tunnel in Swinoujscie. GDDKiA summarized the work in 2022

                In English https://newsbeezer.com/polandeng/tunnel-in-swinoujscie-gddkia-summarized-the-work-in-2022/