English | Spanish | Dutch
Log in

Second tunnel tube breakthrough in Čortanovci

    Bogdan A. Dašić


    in Čortanovci tunnel the second tube is broken with ceremony. Tunnel is on path of high speed train tunnel on the railway section Stara Pazova - Novi Sad. The larger scheme it is part of high speed train line connecting Belgrade and Budapest (Hungary).

    Čortanovci tunnel has two tubes. Each one track. Total length of both tubes is 2,242 meters. The first tube was already broken on April 3 2020.

    Ceremony was attended by Minister of Construction, Transport and Infrastructure Zorana Mihajlovic, the Prime Minister Igor Mirovic, the director of "RZD International" in Serbia Mansurbek Sultanov and representatives of the Russian Embassy in Belgrade.

    http://sremska.tv/2020/06/probijen-tunel-u-cortanovcima/

    image

    image