Analysis of drainage capacity of tunnel during construction period
Shaojia Yang*, Xiaoyu Liu, Gaohui Li, Jinfeng Wang , Hongbo Zhu
PowerChina Huadong Engineering Corporation Limited, Hangzhou, 311122, China
Abstract: In the process of excavation of underground tunnels, water gushing is often accompanied. In
order to avoid affecting the construction schedule and safety, it is necessary to accurately evaluate the
drainage capacity. In this paper, the drainage capacity of the tunnel is reviewed and calculated, and the
effects of longitudinal slope, steel arch and roughness are considered.
https://doi.org/10.1051/e3sconf/202451202025
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
https://doi.org/10.1051/e3sconf/202451202025
Analysis of drainage capacity of tunnel during construction period | E3S Web of Conferences
doi.orgE3S Web of Conferences, open access proceedings in environment, energy and earth sciences