The BMC (Brihanmumbai Municipal Corporation) standing committee on Wednesday cleared a proposal for the construction of a 6km tunnel. It will help prevent the discharge of raw sewage to the Mithi...
The tunnel is part of the 13.10 km long Package-14 handled by Afcons.
https://www.constructionweekonline.in/projects-tenders/19101-longest-tunnel-on-mumbai-nagpur-e-way-to-be-completed-by-sept
"Due to drilling operations for the Bengaluru metro at Shivajinagar, a multi-storeyed house was left flooded with water and mud slurry".
I am especially worried about the latter. What kind of tunnelling is...
Bombay Natural History Society (BNHS) has commenced a biodiversity monitoring survey at Sanjay Gandhi National Park (SGNP) along the route of a proposed subterranean...
The tunnel boring machine (TBM) has only managed to bore 800 metres so far, way lesser than the expected 2.072 kilometres.
https://www.mid-day.com/mumbai/mumbai-news/article/mumbai-part-of-coastal-road-project-work-gets-delayed-again-23187873
https://www.youtube.com/watch?v=14PrsawXEYE
GULERMAK's Terratec S78 Tunnel Boring Machine achieves breakthrough at Budhwar Peth on Pune Metro's 16.59 km Line-1 (Purple...
Telangana state Cabinet's decision to get the Srisailam Left Bank Canal (SLBC) tunnel works moving again is the reason of renewed enthusiasm.
https://www.deccanchronicle.com/nation/politics/090821/cabinet-ordered-power-restoration.html
Contractors MEIL started performing the tunnel works at the Polavaram Hydroelectric Power Station. At the hydroelectric power station there will be 12 tunnels each 9 meters high and 145 meters...
Tunnel Design Engineer
LEA Associates South Asia Pvt. Ltd.4.2(299 Reviews)
Design of Underground structures/Tunnel, Tunnel support system (NATM, NTM and TBM...
https://www.youtube.com/watch?v=GSUgWBfgpwU
MahaMetro’s second tunnel boring machine reached the future Budhwar (Kasba) Peth station site, completing the tunnel excavation work on the Agriculture College Budhwar Peth...
Chinese are upset with loosing India's Tunnel Boring Machine market. India is most likely the most dynamic tunnelling market in Asia maybe in the World.
Out of despair, Chinese supported media started badmouthing India. They claim Indian...
Tunnel Construction Manager shall have minimum of 10 - 15 years of experience with NATM / TBM construction. Out of which 5 - 7 years of experience as Incharge or Next to Incharge on NATM / TBM Construction Project in at least one...
Problem is the geology of rocks below the rail tracks unexpected by the Central Railway officials.
https://www.freepressjournal.in/mumbai/mumbai-central-railways-micro-tunneling-work-at-masjid-station-hits-roadblock
"Nearly 3 years after the first breakthrough at Terminal 2, 16 more TBMs have finished creating almost 53 km of tunnels under Mumbai for the underground Colaba-Bandra-Seepz...
"An engineering marvel with its network of 14 tunnels and 17 bridges in a single broad-gauge rail line".
https://www.aljazeera.com/news/2021/7/28/india-sikkim-rail-project-china-environment
Tunnel boring machines (TBM) of Metro Line 3 in Mumbai were to undertake a hybrid method in order to deliver a platform tunnel in hard rock, as well as deliver some tunnelling firsts for...
https://www.youtube.com/watch?v=Q061VDaeGRw
In a 39th breakthrough for the project, The Robbins Company-made tunnel boring machine Tansa-2 took around 257 days to bore 1,117.5 long tunnel using 745 concrete...