- The Xiyan High -speed Railway Yijun Tunnel total length 17509 meters.
- Contractor Xicheng Passenger Specialty Shaanxi Company and the China Railway Twelfth Bureau Group
- Xi'an to Yan'an high -speed railway is 299.8...
- The Xiyan High -speed Railway Yijun Tunnel total length 17509 meters.
- Contractor Xicheng Passenger Specialty Shaanxi Company and the China Railway Twelfth Bureau Group
- Xi'an to Yan'an high -speed railway is 299.8...
- 3.5-km tunnel is a key segment of the Fruska Gora Corridor in the northern province of Vojvodina.
- Contractor China Road and Bridge Corporation
Please read English news:http://www.china.org.cn/world/2024-08/10/content_117360004.htm
- Project length 8.05 kilometers. 2.5-kilometer road in Qianhai + 1.1-kilometer undersea tunnel + 4.45-kilometer road in the Dachan Bay area
- The Mawan tunnel use largest diameter TBM used for a undersea tunnel in China.
- TBM used...
- maximum underwater depth of 115 meters with a maximum water pressure of up to 1.06 MPa
- Two China Railway Engineering Equipment Group Co., Ltd. (CREG) Tunnel Boring Machines excavated from each end the 13.69 kilometers...
https://www.youtube.com/watch?v=Zq8ESA1xGGg
South Australia's government announces the consortium of John Holland, Bouygues Construction Australia, Jacobs, Arcadis and Ventia as preferred proponent for the River Torrens to Darlington Project...
After 20 years, Ulsan Station - Samdong Road project has progress. Ulsan Press write project is in final design stage. Project is on table for 20 years with slow process.
Finally a route decided. Route has three tunnels and 5 bridges...
https://www.youtube.com/watch?v=_kI5RolHWec
MEED publishes list of companies which are pre-qualified for EPC (Engineering, Procurement and Construction) for the $22bn Dubai Strategic Sewerage Tunnels (DSST) project.
MEED reports there...
Shay Murtagh Precast's project for Hochtief Murphy on the Crossrail C310 Thames Tunnel has been moving swiftly and another significant milestone was celebrated.
Sophia – the first of two Tunnel Boring Machines – made its first...
In Dubai Strategic Sewage Tunnels (DSST) project worth 22 billions of dollars, 3 Turkish contractors have received prequalification for engineering, procurement and construction (EPC).
For packages J1, J2 and W: Gülermak, Doğuş
For...
Economica writes this is what Cristian Pistol, the general director of the National Road Infrastructure Administration Company (CNAIR), announced. The 31.33 km long A1 Boita - Cornetu will have 24 viaducts, 25 bridges, 1 ecoduct and 7 tunnels. A...
Director of Road Development of the Directorate General of Bina Marga Wida Nurfaida said for the construction of immersed tunnel to be built a cooperation will be with South Korean government for the part of Section 4 of the IKN Toll Road....
The tunnel has a total length of 1,839 meters, with three lanes in each direction, a single lane width of 3.5 meters, and a designed speed of 60 kilometers per hour.
https://www.ecns.cn/news/cns-wire/2024-08-06/detail-iheeyrtw7460013.shtml
Total tunnel 4.62 km.
The last tunnel was broken through on Monday for the package 2 project contracted by a Chinese company Poly Changda Engineering Co. Ltd of China under the Kathmandu-Terai/Madhesh fast track...
DPP (Dopravního podniku hl. m. Prahy - Prague Public Transit Company) has announced again the consortium lead by Subterra as the winner for the construction of Prague's Metro D second section.
Some background
About one year ago,...
2.5km circuit between Hurst substation and Crayford is now energised
Minister for Energy, Michael Shanks, visits project as key milestone is reached
Work continues on remaining 30km of circuits between Hurst and Wimbledon to reinforce the...
Hà Nội Metropolitan Railway Management Board (MRB) Tunnel Boring Machine number one (TBM 1) started bore on 30 July. TBM 1 (also name Thần tốc) start at the S9 - Kim Ma station (17.8 m. under ground). After 200 metre, TBM 2 (also...
Known as the diamond capital of the world, Antwerp in Belgium is home to one of the world's major seaports, however, the old city has a major traffic problem. ....
Read more...
Punctul publishes that again the announcement of the final, final, final winner of the lot A3 road construction from Poarta to Nușfalău with Meseș tunnel has been postponed for the third time.
For almost 4 years of tenders, appeals,...