SK E&C develop world’s best tunnel-blasting technology called ’SUPEX-Cut’ through continued investment in technology. SK E&C has “Orchestra Blasting Method” enables efficient large-scale tunneling while minimizing noise and vibration.
SK E&C tunnel technology
The long cut underground excavation method applying simultaneous explosions of wedge holes and parallel holes
http://www.skec.com/asp/en/business/Technology_view.asp?tab=1&iSeq=229
SK E&C tunnel technology
Tunnel and underground construction simulation system that can accurately analyze geological conditions
http://www.skec.com/asp/en/business/Technology_view.asp?tab=1&iSeq=226
SK E&C tunnel technology
Developed T-H-M analysis code FRACOD (FRActure propagation CODe)
http://www.skec.com/asp/en/business/Technology_view.asp?tab=1&iSeq=227
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
SK E&C already successfully opened the Turkish Eurasian Undersea Tunnel, which connects Europe and Asia in 2016. It is a 5.4 km double-layer tunnel that penetrates the seabed of the Bosphorus, which divides the continents of Asia and Europe. Including the land access road, the total length reaches 14.6 km.
SK E & C invested an extra-large TBM with a total length of 120m and a weight of 3300t in the 5th floor (13.7m) of apartments with a cross-section diameter only to penetrate the Eurasian underwater tunnel.
http://www.donga.com/news/article/all/20200330/100412058/1
터키 유라시아 해저터널 성공 개통… 지하터널 공사 기술력 글로벌 최강
www.donga.comSK건설은 터널 등 지하 공간 공사에 탁월한 기술력을 확보하고 있다. 세계 최고 수준의 발파 공법인 ‘수펙스컷(Supex-Cut)’을 개발했고, 원통형 굴착기계인 TBM(Tunn…