Null

English | Spanish | Dutch
Log in

Łódź Cross City Tunnel books progress.

    Teodor Adamczyk

    The Cross City tunnelling of Łódź has finally started booking progress. The project is full of delays. First Energopol Szczecin, a consortium member got into problems and had to be replaced by another company. Then came COVID-19 etc.

    12,7 m in diameter TBM Katarzyna will bore a two-track tunnel to Łódź Fabryczna 3km long. It has so far bored 200 meters/

    The 8,76 meter  Faustyna will bore the tunnels between  Łódź Kaliska and Łódź Żabieniec, 4 single truck tunnels of 4,5 km long. The TBM has done much better. It has already bored 700 meters.

    The construction of a cross-city tunnel under Łódź is the largest such investment in Poland. It costs PLN 700 million (PLN 400 million comes from European Union).

    https://lodz.tvp.pl/57025470/tunel-srednicowy-w-lodzi-jak-przebiegaja-prace

    image

    image