Norway: Statkraft Energi AS applies for the tunnel build permit for Svean power plant
Statkraft Energi AS is applying for a discharge permit for the operation of a tunnel in connection with the construction of a new Svean power plant. The construction work...Reply on topic: 10 Km long China-Laos Railway Friendship Tunnel boring finished
Yes the China-Laos tunnel boring is completed. But at what cost? Reportedly waterways are full of tunneling chemicals. It will effect the livelihood of people and more direct...Germany: PORR to build caverns and tunnel system for Forbach pumped storage power plant
Vienna/Munich, 05.07.2023 – EnBW Energie Baden-Württemberg AG is investing around EUR 280m in the conversion of the Rudolf Fettweis Plant (RFW) in Forbac...Aerial LiDAR survey begins for Mumbai-Ahmedabad bullet train project
Important step for the project with 87.5 km of viaducts and bridges, 25 crossing bridges, a tunnel, 97.50 km of roads, one station, a maintenance depot, 4 sub-maintenance depots. https://www.knocksense.com/mumbai/aerial-lidar-survey-begins-for--mumbai-ahmedabad-bullet-train-project
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com